The Stormwater Development Permit Guideline states:
"The total impervious cover of the site should minimize impact on the receiving aquatic environment. Consideration should be given to reducing impervious cover through reduction in building footprint and paved areas and use of on-site infiltration."
The guideline applies to: Institutional properties that are increasing impervious surfaces — those that do not absorb water — by 250 m2 or more and subject to the Saanich General Development Permit Area.
There are two parts to your permit application process. Find your forms and documents below.