Valve and Hydrant Maintenance

Area:  Pat Bay Highway from southbound Central Saanich border to Haliburton Road

Impacts: Rolling Lane Closures

  • All traffic and emergency vehicles will have access
  • Traffic Control will be onsite with signs, please obey

Expected Schedule: Thursday, September 19, 2019 to Friday, September 20, 2019;

10 p.m. to 6 a.m.

______________________________________________________________________

Water Main Installation

Area:  Blenkinsop Road at Moorgreen Place  

Impacts

  • All traffic and emergency vehicles will have access.
  • There will be traffic control on site to assist with traffic. Please obey their directions and all traffic signs.

Expected Schedule: Friday, September 20, 2019; 8 a.m. to 3 p.m.

______________________________________________________________________

Water Service Install

Area:  881 Short Street between Saanich Road and Oak Street

Impacts: Road Closed

  • Only emergency vehicles and local traffic will have access, all other traffic is asked to use alternate routes
  • There will be traffic signs posted to help inform and direct traffic

Expected Schedule: Monday, September 16, 2019 to Friday, September 20, 2019;

9 a.m. to 4 p.m.

_______________________________________________________________________

Finnerty Road Closure - Asphalt Paving

Area:  Between Finnerty Road and Edgelow Street to Arbutus 

Impacts: Road closures and single-lane alternating traffic 

  • Access for local traffic and emergency vehicles only. All other traffic use alternate routes.
  • BC Transit detours in effect during road closures - Routes #11 and #12 (visit BC Transit for info https://www.bctransit.com/victoria)
  • There will be traffic control on-site to assist with traffic. Please obey all traffic signs and the direction of traffic control personnel.
Expected Schedule: Thursday, September 19, 2019 and Friday, September 20, 2019; 9 a.m. to 8 p.m.
Last Updated:  Sept 19, 2019

 ______________________________________________________________________

Sidewalk Construction

Area:  Caen Road (Dieppe Road to Quadra Street)     

Impacts: Single lane alternating traffic

  • All vehicles will have access.
  • There will be traffic control on-site to assist with traffic. Please obey their directions and all traffic signs.

Expected Schedule: Tuesday, September 10, 2019 to Friday, October 4, 2019; 8:30 a.m. to 4 p.m.

_______________________________________________________________________

Road/ Sidewalk Construction

Area:  West Saanich Road (Quadra overpass- Royal Oak Shopping Centre)

Impacts: Single Lane Traffic- on occasion

  • All vehicles will have access.
  • There will be traffic signs posted and traffic control to help inform and direct traffic

Expected Schedule: Wednesday, July 31, 2019 to Friday, November 29, 2019; 9 a.m. to 3:30 p.m.

______________________________________________________________________

Albina-Gorge Sinkhole Project

Area:  Gorge Road West at Albina Street

Ongoing Traffic Restrictions: Access to Albina Street from Gorge Road West remains closed.

  • The southbound lane of Albina Street from the Gorge Shopping Centre to Obed Avenue is closed with access permitted for residential traffic only.
  • The northbound lane remains active for both directions of traffic, vehicles are to yield as appropriate using the gravel shoulder as required.
  • BC Transit shall remain operational throughout this section of road, except for dates as noted.

New Traffic Restrictions:  Gorge Road West.

  • One way traffic each direction (September 23 to October 4, excluding weekends)
  • Full road closure Gorge Road West at Albina Street (October 7 - 11)
  • BC transit routes will be affected for this closure.
  • Appropriate signage and detour routes will be in affect through this area.

Expected Schedule: Monday, September 23, 2019 to Friday, October 11, 2019; 8:30 a.m. to 4:30 p.m.

AlbinaSinkhole_ProjectUpdateNo2_20190917.pdf [PDF - 349 KB]