Keats Pedestrian Bridge and Utilities Replacement Project

Competition Number: T 17/17

Bid Title: Keats Pedestrian Bridge and Utilities Replacement Project

Posted Date: May 29, 2017, 3:00pm

Closing Date: June 22, 2017, 3:00pm

Last Modified: July 20, 2017, 9:41am

Status: Cancelled

Awarded:

Description:

The Owner invites tenders for the work associated with this contract includes the replacement of the Keats Street Pedestrian Bridge and Utilities, including installation of 71m of PVC sanitary sewer, 36m of cast iron watermain, 2 – Type “A” luminaires and underground conduit, restoration of asphalt and creek bank, removal of the existing bridge and underground utilities.

Non-Mandatory Site ExaminationA non-mandatory site examination is scheduled for June 6th, 2017 starting at 10:00 a.m. Meeting in front of 3204 Keats Street, Victoria, BC.

Attendees at the Non-Mandatory Site Visit:  Don Mann Excavating Ltd., G & E Contracting LP, Heavy Metal Marine, Brunnell Construction Ltd., Allterra Construction.

Addendum Letter No. 1, dated June 14, 2017

Addendum Letter No. 2,  dated June 20, 2017 + Attachment ("5-Form_of_Tender_Addendum No 2.pdf")

CANCELLED  June 27, 2017

 

Contact Information:
Documents:

Cover Sheet [PDF - 19 KB]

Invitation to Tenderers [PDF - 26 KB]

Table of Contents [PDF - 35 KB]

Instructions to Tenderers - Part I [PDF - 54 KB]

Form of Tender [PDF - 65 KB]

Appendix 2 [PDF - 18 KB]- Preliminary Construction

Appendix 3 [PDF - 14 KB] - Experience of Superintendent

Appendix 4 [PDF - 16 KB]- Comparable Work Experience

Appendix 5 [PDF - 13 KB] - Subcontractors

Appendix 6 [PDF - 16 KB] - Labour Costs

Appendix 7 [PDF - 17 KB] - Equipment Rates

Appendix 8 [PDF - 20 KB] - Qualifications

Appendix 9 [PDF - 22 KB] - Declaration of Social and Enviromental Practices

Form of Agreement [PDF - 326 KB]

Supplementary General Conditions [PDF - 76 KB]

Supplementary Specifications [PDF - 41 KB]

Project Specifications [PDF - 130 KB]:  Section 01 00 00

Project Specifications [PDF - 46 KB]:  Section 01 10 00

Drawings: Keats Bridge Civil [PDF - 1.7 MB]

Drawings: Keats Bridge Structural [PDF - 1.6 MB]

Drawings: Keats Bridge Electrical [PDF - 171 KB]

Drawing: Standard Steel Bicycle Fence [PDF - 152 KB]

Attachment [PDF - 39 KB]:  Environmental Monitoring Construction Checklist

Attachment [PDF - 127 KB]:  Change Approval and Notification

Attachment [PDF - 3.7 MB]:  Ryzuk Geotechnical Report

Attachment [PDF - 28 KB]:  Environmental Protection Best Management Practices for the Pedestrian Bridge Removal and Replacement

Attachment [PDF - 135 KB]:   Notification Terms and Conditions Leter

Attachment [PDF - 2.6 MB]:   Saanich Hours of Work on District Roadways Operating Procedures

Attachment [PDF - 9 KB]:  Tender Checklist

T 17_17 Addendum Letter No 1.pdf [PDF - 59 KB]

T 17_17 Addendum Letter No 2.pdf [PDF - 23 KB]

 5-Form_of_Tender_Addendum No 2.pdf [PDF - 14 KB]